Forest cross section generated from a LiDAR point cloud
Reservoir bathymetric survey with remote-controlled boat
Lake Mulwala Boardwalk construction managed by 12P Consulting
The boardwalk is a 220m long fibre-composite structure with driven circular piles, substructure and deck
Hume and Hovell Track pedestrian bridge
Bathymetric survey of a water storage reservoir
Modelling bridge waterway areas
UAV survey using the Phantom 4 RTK
Coppabella Ck suspension bridge on the Hume and Hovell Track
3D site scan of a winery operation
Modular bridge construction - Rocla MLock
SURFACE DIFFERENCE MODELLING Using drone-based aerial surveying techniques, airspace volumetric analyses can be undertaken to facilitate reporting to state government agencies and for strategic planning
Tallangatta foreshore amenties upgrade
3D terrain model and structure concept
DJI Matrice 300 with 45 megapixel camera
Tallangatta foreshore upgrade
Aerial imagery captured the extent of the Jan 2022 floods at Corowa
Foreshore walking paths
Tallangatta walking track
Aerial survey in the Upper Murray
Quarry volumetric survey NSW
Skeleton Hill quarry survey
GIS analytics and planning
Clear water storage tank construction
MODULAR BRIDGE CONSTRUCTION Assisting in the construction of a prototype pedestrian bridge
Pomegranate Estate
Aerial photogrammetry
Pavement repair and stabilisation
Landfill air space analysis and management
LANDFILL SURVEYING Setting out ground control points before sending up the drone
Tallangatta foreshore shelters and landscaping
Mission control for a bathymetric survey
Clear water storage tank rehabilitation works